Friday, August 5, 2011

Monday Night Trail Work, August 8, 2011

Trail work session on the Perimeter Trail between the Mitchell Trail and behind Arizona Avenue on Monday.

Location: Meet at Mitchell Trail Yucca and Arizona
When: Monday, August 8, 2011, 5:30 PM to 7:30 PM

Trail work objectives: 1) repair or replace 20 grade dips that were removed or altered when the trail was used as a contingency fireline 2) use lop-and-scatter technique to cover short sections of fireline where it deviates from the trail

What to Bring: Wear long pants and long sleeve shirt, sturdy shoes. Bring work gloves, water. Tools and hard hats will be provided.

This work party is on the Santa Fe National Forest and on Los Alamos County Open Space.

No comments:

Post a Comment

Please enter reports on trail conditions. Thank you.